The content and steps of maintenance for low-voltage distribution boxes.
The rated current of the low-voltage distribution box is AC 50Hz, and the rated voltage of the distribution system is 380V, which is used for the conversion and control of electrical energy for power, lighting, and distribution. This product has strong breaking ability, good dynamic and thermal stability, flexible electrical scheme, easy combination, strong series and practicality, and novel structure.
The maintenance of low-voltage distribution boxes is mainly to ensure the normal and safe operation of low-voltage distribution cabinets. We need to conduct an annual comprehensive physical examination and maintenance of the low-voltage distribution box in Fuzhou. Complete maintenance with minimal power outage time, usually by determining the owner's power outage time in advance.
1: Maintenance should start from the low voltage side of the transformer. After the power supply of the distribution cabinet is cut off, clean the dust in the cabinet, check whether the busbar and down lead connections are good, whether the joint points are heated or discolored, check whether the cable head and wiring pile head are firm and reliable, check whether the grounding wire is corroded, and whether the wiring pile head is fastened. All secondary circuit wiring connections are reliable and the insulation meets the requirements.
2: When checking the drawer switch, the drawer switch cabinet should be flexible when pushed in or pulled out, and the mechanical locking should be reliable. Check if the automatic air switch operating mechanism on the drawer cabinet is in place and if the wiring screws are tightened. Clean the dirt on the surface and around the contactor contacts, check if the contactor contacts are intact. If the contact is poor, it may be necessary to slightly file the contact surface. If the contact is severely eroded (the contact point is worn to 1/3 of its original thickness), the contact should be replaced. The power indicator instrument and indicator light are intact.
3: When repairing the capacitor cabinet, the main switch of the capacitor cabinet should be disconnected first. After discharging the capacitors to the ground one by one with a wire of more than 10mm2, the appearance of the shell should be checked and there should be no oil leakage. If the capacitor shell expands, it should be dealt with in a timely manner, and the wiring screws and grounding devices of the discharge device and control circuit should be replaced. After closing, debug the indicator and automatic compensation parts.
As the global new energy industry accelerates its transformation towards intelligence and greenness, charging facilities, as a key part of the new energy ecosystem,
2025-05-29This mobile energy storage stacked charging pile is composed of one control module, three battery modules, and one charging machine module.
2025-05-29The mobile charging robot has autonomous driving, high-power charging, and QR code payment functions, which can convert each parking spot into a charging spot, effectively solving the problem of car owners finding charging stations.
2025-05-28What is a solar power combiner box? In the solar power generation system, the solar power generation combiner box is a wiring device that ensures the orderly connection and current
2025-05-09The wiring method of Meibian: one or two 10KV incoming lines; A single transformer with a capacity generally ranging from 500KVA to 800KVA; 4-6 low-voltage outgoing cables.
2025-05-09The commonly used method for photovoltaic power stations is to use a two-stage combiner: the photovoltaic string is first converged through the combiner box,
2025-05-08Mobile Energy Storage Mobile Energy Storage Tractor Mobile energy storage charging station Portable mobile energy storage charging station Lift-mounted mobile energy storage charging station Mobile energy storage charging station -200KWh Mobile energy storage charging robot
Energy Storage Cabinet 215 Degree Electric Energy Storage Cabinet 261 Degree Electric Energy Storage Cabinet
Stacked Energy Storage TP-DW-10KWh-5KW TP-DW-12KWh-20KW
PEDF Energy Gateway PEDF Energy Storage
EMS MW Level EMS Energy Storage Controller Energy Storage Controller Energy Storage Coordination Contriller Integrated Controller
Photovoltaic Equipment DC Combiner Box AC Combiner Box Grid Connected Cabinet Confluence Box Monitoringunit
Low voltage switchgear Pump control cabinet Fan control cabinet PLC frequency conversion control cabinet GGJ type low-voltage reactive power compensation cabinet GGD type low voltage fixed switchgear GCS type low-voltage withdrawable switchgear GCK type low-voltage withdrawable switchgear
High voltage switchgear XGN-1224 Fully Insulated and Sealed Inflatable Ring Main Switchgear XGN15-12 AC metal ring network switchgear KYN28A-12 Metal Armored Removable Switch Cabinet KYN28-24 Metal Armored Removable Switch Cabinet
Three boxes and supporting Intelligent distribution box XL-21 power distribution box PXD type AC distribution box
Box type transformer ZGS11-120.4 American Box Transformer YBM-120.4 European Box Transformer
Address:Topband Industrial Park, Liyuan Industrial Zone, Shiyantangtou Avenue, Bao'an District, Shenzhen.
Tel:0755-8178 5236
E-mail:topband_zidh@topband.com.cn
1996-2024@ Shenzhen Topband Automation Technology Co., Ltd. Copyright Powered by szzghlWebsite Map